The small turret containing the top of the phase
inverter and bias for stage #1,
drive stages #2 & #3, and the mixer is wired up and ready to
install.
Small turret board is in place.
The main turret board nears completion. Clean
tone stage sits on the far left, the channel switch near
dead center, drive stages #2 & #3 in the vise, and the bottom of the
phase inverter to the far right.
Two shielded bundles need fitting under the board, also the grid and
plate circuitry for the mixer,
and finally the switching board for the master volume & "More Dickie"
pots.
Its all coming together, stay tuned...